top of page
flux energy logo2.jpg
flux energy logo2.jpg

PROJECTS

We have designed, engineered and supported the construction of over 5 GWh of operating battery energy storage, 400 solar photovoltaic projects and 800 ports of electric vehicle charging stations. See below for a sample of our operating projects.  We have many more on the way!

ESCAPE_edited_edited.jpg
Escape BESS

Lithium Ion Battery Storage

Capacity: 100 MW / 400 MWh

Project Completed: 2026

Client: Tesla

Project Overview

Intersect.png
Intersect Portfolio

Lithium Ion Battery Storage

Capacity: 480 MW / 960 MWh

Project Completed: 2025

Client: BHI, Inc. 

Portfolio Overview

1-Megapack2XL_73.jpg
Eland I and II BESS

Lithium Ion Battery Storage

Capacity: 300 MW / 1.2 GWh

Project Completed: 2024

Client: Tesla 

Eland Details

IMG_9982 (Helix - Panels)_edited_edited.
Fresno Juvenile Center

Single Axis Tracking PV

Capacity: 3.8 MW

Project Completed: 2021

Client: Helix Electric

Solar Builder Project of the year Award (2022)

CalFlats Site 8-18-2021_edited_edited.jpg
Cal Flats Bess

Lithium Ion Storage

Capacity: 60 MW / 240 MWH

Project Completed: 2021

Client: Affordable Solar

Cal Flats Megapack Video

ves_edited.jpg
Ventura Energy Storage

Lithium Ion Battery Storage

Capacity: 100 MW / 400 MWh

Project Completed: 2020

Client: Affordable Solar

EEPower Article

RP4_whclogo_1B (1)_edited_edited.jpg
RP4 Solar Plus Storage

Fixed tilt PV, Lithium Ion

Capacity: 1 MW PV, 1 MW BESS

Project Completed: 2018

Client: Advanced Microgrid Solutions

wildcat_edited_edited.jpg
Wildcat Energy Storage

Lithium Ion Battery Storage

Capacity: 3 MW / 6 MWh

Project Completed: 2020

Client: esVolta

Kroger_edited.jpg
Kroger Solar

Ballasted Fixed Tilt PV

Capacity: 2.5 MW

Project Completed: 2018

Client: Various

Click on the state to see the projects completed in each state.

LOCATIONS

CA

NV

TX

NM

CO

AZ

Other

690 MW | PV SOLAR

PRELIMINARY ENGINEERING

CLARK COUNTY, NV

300 MW | ENERGY STORAGE

PROJECT ENGINEERING

KERN COUNTY, CA

220 MW | ENERGY STORAGE

PROJECT ENGINEERING

MOAPA, NEVADA

175 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

LOS ANGELES COUNTY, CA

102 MW | ENERGY STORAGE

PROJECT ENGINEERING

VENTURA, CA

100 MW | ENERGY STORAGE

PROJECT ENGINEERING

ANGLETON, TX

80 MW | ENERGY STORAGE PORTFOLIO (8 SITES)

PROJECT ENGINEERING

MULTIPLE LOCATIONS, CO

48.5 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

CASTAIC, CA

15.2 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

CASTAIC, CA

8 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

DELAWARE

5 MW | ENERGY STORAGE

PROJECT ENGINEERING

TEHACHAPI, CA

3 MW | PV SOLAR

PROJECT MANAGEMENT

PATTERSON, CA

2.5 MW | ENERGY STORAGE

OWNER'S REPRESENTATION

ORANGE COUNTY, CA

1.5 MW | MICROGRID

PRELIMINARY ENGINEERING

PORTERVILLE, CA

1.161 MW | PV SOLAR

PRELIMINARY ENGINEERING

ATASCADERO, CA

1 STATION | LEVEL III FLEET

PROJECT ENGINEERING

LONG BEACH, CA

0.7 MW | PV SOLAR

PROJECT ENGINEERING

HOPKINTON, MA

0.5 MW | PV SOLAR

PROJECT ENGINEERING

EL PASO, TX

0.16 MW | PV SOLAR

PRELIMINARY ENGINEERING

CATALINA ISLAND, CA

0.08 MW | PV SOLAR

PROJECT ENGINEERING

MARVISTA, CA

160 MW | ENERGY STORAGE (SITE 1)

PROJECT ENGINEERING

SNYDER, TX

600 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

MULTIPLE LOCATIONS, INTERNATIONAL

250 MW | PV SOLAR

OWNER'S ENGINEERING

KERMIT, WINKLER COUNTY, TX

205 MW | PV SOLAR

PRELIMINARY ENGINEERING

LA JARITA, TX

150 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

CENTRALIA, WA

100 MW | ENERGY STORAGE

PROJECT ENGINEERING

FALCON, CO

96 STATIONS | LEVEL II FLEET

PRELIMINARY ENGINEERING (4 SITES)

VENTURA, CA

60 MW | ENERGY STORAGE

PROJECT ENGINEERING

PARKLAND, CA

37.5 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING (15 SITES)

MULTIPLE LOCATIONS, CA

12 MW | ENERGY STORAGE PORTFOLIO (15 SITES)

PROJECT MANAGEMENT PORTFOLIO

MULTIPLE LOCATIONS, CA

6.53 MW | PV SOLAR

OWNER'S ENGINEERING

FALLBROOK, CA

4.84 MW | PV SOLAR + STORAGE

PROJECT ENGINEERING

FRESNO, CA

3 MW | PV SOLAR

OWNER'S REPRESENTATION

AUSTIN, TX

2.5 MW | PV SOLAR

PROJECT ENGINEERING

SAN ANTONIO, TX

1.432 MW | PV SOLAR

OWNER'S ENGINEERING

SMITHVILLE, TX

1.09 MW | PV SOLAR

PRELIMINARY ENGINEERING

MONTEBELLO, CA

1 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

WEST HILLS, CA

0.676 MW | PV SOLAR

PRELIMINARY ENGINEERING

WEST WAREHAM, MA

0.2496 MW | PV SOLAR

PRELIMINARY ENGINEERING

CLOVIS, CA

0.1464 MW | PV SOLAR

PRELIMINARY ENGINEERING

CLOVIS, CA

0.031 MW | PV SOLAR

PROJECT ENGINEERING

WILMINGTON, CA

160 MW | ENERGY STORAGE (SITE 2)

PROJECT ENGINEERING

SNYDER, TX

500 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

LOS LUNAS, NM

247 LEVEL II CHARGERS | EV CHARGING PORTFOLIO (12 SITES)

PROJECT ENGINEERING

VENTURA, CA

200 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

BRIGHTON, CO

150 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

HAWAII

100 MW | ENERGY STORAGE

PROJECT ENGINEERING

FORT STOCKTON, TEXAS

90 MW | ENERGY STORAGE

PROJECT ENGINEERING

CLARK COUNTY, NV

60 MW | ENERGY STORAGE

PROJECT ENGINEERING

SANTA PAULA, CA

30 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

SANTA PAULA, CA

10 MW | PV SOLAR

PRELIMINARY ENGINEERING

MULTIPLE LOCATIONS, MA

5 MW | PV FLOATING SOLAR

PROJECT ENGINEERING

MARICOPA COUNTY, AZ

3.7 MW | PV SOLAR

OWNER'S ENGINEERING

KLAMATH, OREGON

3 MW | ENERGY STORAGE

PROJECT ENGINEERING

PALM SPRINGS, CA

2.11 MW | PV SOLAR PORTFOLIO (16 SITES)

PROJECT ENGINEERING

MULTIPLE LOCATIONS, TX

1.425 MW | PV SOLAR

PRELIMINARY ENGINEERING

SANTA ROSA, CA

1.08 MW | PV SOLAR

PRELIMINARY ENGINEERING

PASO ROBLES, CA

1 MW | PV SOLAR

PROJECT MANAGEMENT

TRACY, CA

0.5376 MW | PV SOLAR

PROJECT ENGINEERING

SAN DIEGO, CA

0.207 MW | PV SOLAR

PRELIMINARY ENGINEERING

HOUSTON, TX

0.1264 MW | PV SOLAR

PROJECT ENGINEERING

BOSTON, MA

0.03 MW | PV SOLAR

PROJECT ENGINEERING

SAN DIEGO, CA

389 STATIONS | LEVEL II CHARGING PORTFOLIO

PROJECT ENGINEERING (16 SITES)

VENTURA, CA

230 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

SACRAMENTO COUNTY, CA

200 MW | ENERGY STORAGE

PROJECT ENGINEERING

RIVERSIDE COUNTY, CA

150 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

RIO RANCHO, NEW MEXICO

100 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

COLORADO SPRINGS, CO

83 MW | PV SOLAR

PRELIMINARY ENGINEERING

LAMAR COUNTY, TX

56 STATIONS | LEVEL II FLEET

PRELIMINARY ENGINEERING

CLOVIS, CA

24 KW | MICROGRID

PROJECT ENGINEERING

LOS ANGELES, CA

10 MW | ENERGY STORAGE

PRELIMINARY ENGINEERING

WALLIS, TX 77485

5 MW | ENERGY STORAGE

PROJECT ENGINEERING

DAGGET, CA

3 MW | PV SOLAR

OWNER'S ENGINEERING

CHATSWORTH, CA

2.6 MW | PV SOLAR

PROJECT ENGINEERING

PARAMOUNT, CA

2 MW | ENERGY STORAGE

PROJECT ENGINEERING

THOUSAND OAKS, CA

1.195 MW | PV SOLAR

PRELIMINARY ENGINEERING

DELANO, CA

1 MW | PV SOLAR

PROJECT MANAGEMENT

SAN BERNADINO, CA

0.8256 MW | PV SOLAR

PRELIMINARY ENGINEERING

VISALIA, CA

0.5263 MW | PV SOLAR PORTFOLIO (4 SITES)

PRELIMINARY ENGINEERING

GOLETA, CA

0.179 MW | PV SOLAR

PROJECT ENGINEERING

VICTORVILLE, CA

0.126 MW | PV SOLAR

PROJECT ENGINEERING

BOSTON, MA

160 MW | ENERGY STORAGE

PROJECT ENGINEERING

BROWN COUNTY, TX

​

Follow us on LinkedIn for Updates

  • LinkedIn - Grey Circle

© 2019 by Flux Energy Systems.

bottom of page